Norfolk Southern Facility | Charlotte, NC | Commercial Skylight Replacement

Norfolk Southern Facility | Charlotte, NC | Commercial Skylight Replacement

 

Natural lighting plays a vital role in large industrial facilities, but aging clear panels often degrade into sources of blinding glare, uncomfortable solar heat gain, and structural vulnerabilities. Our team recently upgraded the daylighting system at the Norfolk Southern facility located on 312 W. Liddel Street in Charlotte, North Carolina.

Every successful commercial roofing project begins with careful coordination before equipment moves onto the roof deck. We initiated the project with an on-site pre-construction meeting to establish staging zones, active shift hours, safety protocols, roof-loading procedures, and a dedicated ground-level dumpster area. This organized footprint allowed our crew to operate efficiently without interrupting day-to-day freight and rail operations.



NSC 2

 

The primary scope centered on replacing an existing 12′ x 16′ skylight section. Our crew removed and disposed of the aged clear panels, replacing them with Palram SunSky Corrugated Polycarbonate Panels in a white translucent finish engineered for 55% or lower light transmission. This translucent material diffuses harsh direct sunlight uniformly across the facility floor, eliminating intense hot spots and eye strain while filling the interior with balanced, usable daylight.

 

To lock out moisture and protect against wind-driven rain, the perimeter and overlaps were sealed using heavy-duty Marco Industries Closure-Foam strips alongside Tremco Vulkem 116 Polyurethane Sealant. This allowed the new panels to integrate cleanly into the existing roof architecture while reusing the building’s durable metal trim.

 

 

Maintaining an active industrial site requires constant attention to job-site cleanliness. Our crew conducted full cleanups at the close of every workday to ensure access routes and surrounding ground areas remained spotless. After finishing the installation, we completed a formal walk-through with the building representative to review the assembly and ensure every specification was met.

Â