Blue ridge community college

Blue Ridge Community College

Blue Ridge Community College TPO Roof Replacement

Brcc roof diagram

Project Snapshot:

  • 4’x4’ drain slumps at all drain locations.
  • 2 layers of 2.6” Polyisom(R-30) mechanically fastened per FM 1-90 standards to existing metal deck.
  • Polyiso tapered insulation package mechanically fastened per FM 1-90 standards to existing metal deck.
  • ½” primed Densdeck roof cover board.
  • new Retro-fit roof drains at all drain locations.
  • 6” fabric with two coats of Hydro-Stop Foundation Coat.
  • 40” fabric with two coats of Hydro-Stop Foundation Coat.
  • Three coats of Hydro-Stop Finish Coat.

Your roof should keep your people and property safe and dry.

We’ve helped over 1,000 businesses with their roofing repair, replacement, and maintenance needs.

Our Clients

For Dependable & Timely Commercial Roofing, You Can Count On Us.

We empower you to focus on what matters most – driving your business forward.