Blue Ridge Community College
Project Snapshot:
- 4’x4’ drain slumps at all drain locations.
- 2 layers of 2.6” Polyisom(R-30) mechanically fastened per FM 1-90 standards to existing metal deck.
- Polyiso tapered insulation package mechanically fastened per FM 1-90 standards to existing metal deck.
- ½” primed Densdeck roof cover board.
- new Retro-fit roof drains at all drain locations.
- 6” fabric with two coats of Hydro-Stop Foundation Coat.
- 40” fabric with two coats of Hydro-Stop Foundation Coat.
- Three coats of Hydro-Stop Finish Coat.